Hilo International Airport — Hawaii

Completed Projects

Refurnished lobby with a Hawaiian theme

  • Replaced the terminal roof 
  • Replaced the air conditioning chiller plant and cooling system
  • Refurnished the lobby
  • Replaced three passenger-loading bridges 
  • Completed the Keaukaha Subdivision Noise Attenuation Pilot Project
  • Repaired pavement to taxiways and ramps
  • Installed new windows with steel frames on the second floor

 

Projects in Progress

  • Construct new, 60,000 square foot cargo facility, parking (phase 2) and apron (phase 1) to replace      the current facility in the old terminal, which was not designed for current operational needs
  • Monitoring aircraft noise levels to determine what mitigation measures should be implemented for      the communities close to the airport

Long Term Efforts

  • Expand existing parking lot to add 800 stalls
  • Update Hilo Airport’s master plan and noise program
  • Keaukaha Subdivision Noise Attenuation Program, phase 2