Holdroom and Gate Improvements, OGG

Progress

  • DesignMay 7 2018
  • ProcurementMar 30 2020
  • ConstructionMay 19 2021
CompletionDec 3 2024
OGG

Kahului Airport


Construction of a new holdroom between the existing Holdrooms A and B, along with a new passenger gate and loading bridge.  Work also includes enclosure and air conditioning of the existing second level open concourse, removal of the walls and sliding doors that separate the holdrooms from the concourse, construction of an outdoor seating area and garden deck, replacement of finishes at the existing Holdrooms A and B, expansion of the aircraft parking apron, and re-striping of the aircraft parking positions to accommodate the new gate and loading bridge.