Perimeter Fence Replacement, KOA
Progress
- DesignQ4 2018
- ProcurementQ1 2022
- ConstructionTBD
CompletionTBD
KOA
Ellison Onizuka Kona International Airport at Keāhole
The replacement of existing perimeter fence along the North and West facing portions and installation of three (3) vehicle gates along the West facing portion. The replacement of eleven (11) AOA pedestrian and vehicle gates. Construction of a new perimeter fence surrounding the emergency generator site with three (3) vehicle gates.