Terminal 2 Parking Structure Improvements, HNL
Progress
PlanningMay 1 2024
DesignFeb 5 2025
ProcurementJan 29 2026
Pre-ConstructionTBD
ConstructionTBD
Post-ConstructionTBD
Project Scope
Improvements to the Terminal 2 parking structure, including but not limited to the following: full rehabilitation of the concrete vehicular riding surface on the top level of the parking structure; concrete spall repairs throughout the parking structure; improvements to the damaged and deteriorated drainage and sewer system infrastructure that supports the parking structure; overhaul of the damaged electrical systems; and possible hazardous material abatement.
Progress Updates
30% Schematic design reviewed by DOT-A.
Additional coring performed at 5th level of parking structure to assess existing topping slab thickness and determine proper material required for new top slab.
Design work ongoing.